+86-15123173615

Shantui SE215EI Electric Excavator Supports National Hydropower Duilding

Mar 03, 2025

As a major economic province in the north, Shandong has always been committed to improving the safety, stability, and reliability of power grid operation, and try to solve the increasingly prominent contradiction of power grid peak regulation to better serving economic development. In the new era of accelerating evolution of energy revolution and the building of new power system, Shantui SE215EI, with its core advantages of "zero emissions, low energy consumption, and strong power", is helping to promote the green and low-carbon transformation of energy.

 

It is reported that the project is located in the central part of Shandong Province and is a major energy infrastructure project planned and constructed by the country. The total investment is over 10 billion yuan, and it requires the excavation of over 2000 meters of waterway system engineering tunnels, as well as difficult construction operations such as inclined shafts for water diversion systems. The geographical environment is variable, especially for tunnel construction, which faces many challenges such as limited space, dust, and humidity. The construction inside the tunnel requires extremely high requirements for the excavator's passability and maneuverability. This Shantui 215 electric excavator has smooth daily operation movements, strong continuity, and is especially suitable for long-term high-intensity operations. There is almost no power attenuation, and there is no need to replace the filter element. Even in harsh environments, it is not afraid. It not only saves money but also saves worry when used, "said the excavator operator.

 

Characteristics of SE215EI:

High-end new energy "three electricity system", zero emissions, maintenance free;

Multiple high and low voltage safety strategies ensure personal safety and stable operation of equipment;

433kW · h high-performance large capacity lithium battery with ultra long endurance;

Intelligent dual gun integrated fast charging station, charging time less than 1.5 hours;

Permanent magnet synchronous motor, low-speed high torque, strong power;

The whole machine has low operating noise, making construction quieter;

Equipped with AIOC matching technology and multiple energy-saving control strategies;

Accurate matching of working conditions, high efficiency and energy saving;

Compared to gasoline powered vehicles under the same operating conditions, the overall cost savings are over 50%;

Intelligent cockpit, ROPS, OPG safety certification;

Strengthen the dismounting and bucket;

The bucket capacity is 1.05m ³ and the excavation force is 148kN.

 

In the future, Shantui will continue to increase technological innovation in the field of new energy, provide customers with green and efficient construction solutions, and work together towards a new era of green construction.

Send Inquiry